top of page
Railway Tracks

Feasibility Studies

Key Components of Our Feasibility Studies:

  1. Site Visit and Photographic Report:

    • Thorough on-site assessments culminating in a detailed photographic report of the project route.

  2. GPS Location and Engineer's Line Reference:

    • Precise GPS location to determine approximate engineer's line reference and railway mileage.

  3. Network Rail On-Track Report:

    • In-depth report detailing the specific area within Network Rail's infrastructure under consideration.

  4. Authorized NWR Access Points:

    • Identification of authorized access points to Network Rail infrastructure, crucial for project planning.

  5. Sectional Appendix and Signalling Diagrams:

    • Detailed diagrams providing insights into track layout, signaling systems, and rail operations.

  6. Network Rail Hazard Directory:

    • Comprehensive directory highlighting potential hazards and considerations specific to the area.

  7. Desktop Utility Record Search:

    • Thorough search of utility records to detect potential conflicts and challenges.

  8. Submission of Development Questionnaire:

    • Skillful submission of a Network Rail development questionnaire to NWR Asset Protection, inclusive of proposal details.

Vital Consultancy Services specialises in feasibility studies to assist clients in developing land adjacent to Network Rail infrastructure. We provide a range of services designed to accurately assess the viability and safety of your project, including route surveys, environmental assessments, and condition assessments.

Railway Tracks

Contact Us

Thanks for submitting!

bottom of page